<code id="osqgg"><xmp id="osqgg">
<optgroup id="osqgg"><div id="osqgg"></div></optgroup>
<center id="osqgg"></center><optgroup id="osqgg"><div id="osqgg"></div></optgroup>
<noscript id="osqgg"></noscript>
<center id="osqgg"></center>

Navigation

  • Skip to Content
This website uses cookies, our own and those of third parties, to provide the best possible experience. By continuing to use our website you consent to the use of these cookies. For more information, please Click Here
Putzmeister
SANY Logo
  • MERCHANDISING SHOP
MY Putzmeister

Join the conversation

PGSRegions-web Portlet

  • INTERNATIONAL
  • EUROPE
  • AMERICAS
  • ASIA PACIFIC
  • AFRICA & MIDDLE EAST
  • RUSSIA & CIS
  • INDIAN SUBCONTINENT
  • English

Navigation

Toggle navigation
  • Updates
    image
    Updates

    Your window to the latest happenings at Putzmeister

    • Putzmeister in the News
      image
      Putzmeister in the News

      The latest news from Putzmeister

      • Asset Publisher

        On February 17th, 2020 Mr. Pius Neo joined Putzmeister as Regional Parts and Service Manager Asia Pacif...READ MORE

    • Press Releases
      image
      Press Release

      Heads up on what’s happening on Putzmeister

      • Asset Publisher

        On February 17th, 2020 Mr. Pius Neo joined Putzmeister as Regional Parts and Service Manager Asia Pacif...READ MORE

    • PM Post
      image
      PM Post

      Keeping you in the know

      • Asset Publisher

        Best Support Underground seeks to provide readers with useful, inspiring content about the wonderful wo...READ MORE

    • Events
      image
      Events

      Bringing Putzmeister to you

      • Asset Publisher

    • Archives
      image
      Archives

      The Putzmeister Encyclopedia

  • Success Stories
  • Products
    image
    Products

    Our extensive range of equipment

    • Concrete
      Concrete

      Solutions to all your concrete needs

      • CONCRETE PUMPS
        • TRUCK MOUNTED CONCRETE PUMPS
        • STATIONARY CONCRETE PUMPS
        • CRAWLER CONCRETE PUMPS
        • PRE-CAST EQUIPMENT
        • BORE PILE FILLING
      • PLACING SYSTEMS
      • BUFFER STORAGE
      • TECHNOLOGY
      • USED MACHINES
    • Shotcrete
      Shotcrete

      Power & accuracy to deliver results

      • MECHANISED
      • MANUAL
      • WET-MIX
      • TECHNOLOGY
      • USED MACHINES
    • Telebelt?
      Telebelt?

      Versatile equipment for quick results

      • PRODUCT RANGE
      • TECHNOLOGY
      • USED MACHINES
    • Mortar
      Mortar

      Reliable. Productive. User-friendly

      • COMPRESSED-AIR SCREED CONVEYORS
      • PUMPS FOR SELF-LEVELLING COMPOUND
      • SELF LEVELLING SCREED PUMPS
      • PLASTERING MACHINES
      • PUMPS FOR CONCRETE REPAIR
      • PUMPS FOR GEOTHERMAL DRILLING
      • PUMPS FOR FIRE PROTECTION
      • PUMPS FOR GLASS FIBRE REINFORCED CONCRETE
      • PUMPS FOR INJECTION/GROUTING/FILLING
      • PUMPS FOR MASONRY MORTAR
      • ETICS COMPOSITE BINDER
      • SAND,GRAVEL AND AGGREGATE
      • TECHNOLOGY
      • USED MACHINES
    • Tunnelling
      Tunnelling

      Safety. Quality. High Performance

    • Mining
      Mining

      Master the underground

    • Energy
      Energy

      Prioritising energy conservation

    • Environment
      Environment

      Reliable, eco-friendly systems

  • Support
    image
    Support

    Helping your operations run smoothly

    • Service
      image
      Service

      Helping your operations run smoothly

      • Warranty
      • Register Equipment
    • Training
      image
      Training

      Make the best use of your machines

  • Parts
  • About Us
    image
    About Us

    Get to know us better

    • Putzmeister at a glance
      image
      Putzmeister at a glance

      What Putzmeister’s all about!

    • Technology
      image
      Technology

      Putzmeister offers high-end Technology

    • Global Leadership & Our Team
      image
      GLOBAL LEADERSHIP & OUR TEAM

      Meet our skilled team

    • Our History
      image
      Our History

      Putzmeister : how it began to now

  • Contact Us
  • Careers
  • Webshop
  • Search
  • Search

    Search

    search

Success Story Details - ASIA PACIFIC

Asset Publisher

  • QINGHAI-TIBET RAILWAY, CHINA

    MEN AND MACHINES BATTLED INHOSPITABLE TERRAIN, FREEZING TEMPERATURES TO CONSTRUCT THIS RAIL LINE

THE TRAINS HERE HAVE OXYGEN MASKS FOR THE PASSENGERS. IMAGINE THOSE LAYING THE TRACK

| Asia Pacific | Story
  • Share on Facebook
  • Share on Twitter
  • Share on LinkedIn

Building a 1,118km railway line at what could easily be the top of the world is a task fraught with mind-boggling challenges.

One of the key projects in China’s tenth five-year plan (2001 – 2005), the Qinghai-Tibet rail connection was expected to have immense political, military and economic significance for The People’s Republic.

More than 50 years ago, Chinese politicians like Mao Ze Dong and Chou En Lai had already made a case for the construction of a railway line connecting the far western regions of China to the central government in Peking.

The first 846km long segment between Xining and Golmud was launched in 1959 and completed in 1979. Plagued by problems involving the physical condition of workers, financial constraints, and sub-zero temperatures, the project came to a standstill for the next 20 odd years.

Construction of the remaining stretch of line between Golmud and Lhasa was resumed from both ends only in June 2001.

PUTZMEISTER EQUIPMENT

Discontinued Products

VIEW ALL PRODUCTS

The Challenge :

? With more than 85% of the route lying at altitudes ranging between 4,000m and 5,100m laying the line was an unprecedented engineering feat deserving serious respect.

? Among the challenges of construction at high altitudes in extremely inhospitable terrain is the rarefied air that makes breathing difficult and adversely affects stamina

? Windstorms, sandstorms and earthquakes further caused hazardous conditions to become even more inhuman.

? Machines and mixers fared no better with lack of water at the barren plateau at that daunting height.

 

The 1,118km Qinghai-Tibet railway line has immense political, military and economic significance for The People’s Republic.

The 1,118km Qinghai-Tibet railway line has immense political, military and economic significance for The People’s Republic.

 

The Solution :

The construction firm, China Railway Co. Bureau No. 3, opted to beat the odds with Putzmeister’s truck-mounted concrete pumps, including the BSF 36.09, capable of pumping up to 90m3 /h. The Putzmeister M 36 was used at altitudes between 4,800m and 5,000m, but because of the thin atmosphere, the vehicle’s diesel motor was unable to develop full power. The general rule of thumb dictates that power is derated by 10% for every 1,000 m of altitude; this drop in power affects the delivery output of the concrete pump. Despite these odds, the BSF 36.09 was able to develop a pump performance of up to 30 m3 /h.

The M 36 Putzmeister was operated by two machinists who had to constantly brave conditions that ranged from lack of oxygen to permafrost that froze the soil to as deep as 5m down, and summer thaws that resulted in slush and landslides. They also had to deal with difficulties in the classification of concrete aggregate and in maintaining the desired grading curve. But they soldiered on.

By the time the final stretch of the line had been laid between Golmud and Lhasa in 2006, an extraordinary amount of resources had been put to the test, including Putzmeister’s expertise. Both have stood the test of time.

Project Partners

China Railway Co. Bureau No. 3

The Putzmeister M36 was used to tackle the atmospheric challenges posed by altitudes ranging between 4,800m and 5,000m.

The Putzmeister M36 was used to tackle the atmospheric challenges posed by altitudes ranging between 4,800m and 5,000m.

Concrete Takeaways:

? The seemingly impossible railway line that tested everyone’s prowess has reduced a three day road trip from Golmud to Lhasa to as little as 18 hours.

? 80,000 labourers and technicians worked at diminished capacity due to the high altitudes.

? The historic 1,118 km Qinghai-Tibet rail connection was almost 50 years in the making. Putzmeister was brought into the picture in 2001 and delivered by 2006.

NEXT UP IN SUCCESS STORIES

  • Jin Mao building, Shanghai
  • Qinghai-Tibet Railway, China

VIEW ARCHIVES

Putzmeister Logo

Putzmeister South East Asia CT Pte Ltd.

No. 7 Kranji Loop
Singapore 739543

Phone: +65-6293 20 29 
Facsimile: +65-6293 11 58 
E-mail: 
contact.apac@putzmeister.com

PARTNERNET

CRM

  • PARTNERNET
  • CRM

Products

  • Concrete
  • Shotcrete
  • Telebelt?
  • Mortar
  • Tunnelling
  • Mining
  • Energy
  • Environment

UPDATES

  • Putzmeister in the news
  • Press Releases
  • PM Post
  • Events

Success Stories

  • Jin Mao building, Shanghai
  • Qinghai-Tibet Railway, China

Spare Parts


SUPPORT

  • Service
  • Warranty
  • Training

ABOUT US

  • Our History
  • Putzmeister at a glance
  • Global Leadership & Team
  • Technology

CAREERS


Used Machines


CONTACT US


Privacy Statement

  • PM SINGAPORE
  • PM JAPAN
  • PM KOREA

Imprint


MERCHANDISE

Downloads


Sitemap
日本漫画之无翼德漫画